top of page
$30 million annual profit for a Western African mine
From 2018 to 2020, our team implemented a major operational excellence program for the Bissa-Bouly mine in Burkina Faso:
-
Installation of solar panels: 20% of the site's energy needs, 10% reduction in the total energy cost.
-
New shift change procedures and improved lunch breaks: +9% daily production.
-
Optimization of operator teams: +18% daily production.
-
Better organization and reduction of daily service times: Improved OEE/TRS by 4 points.
-
Optimization of condition monitoring and maintenance planning: +5 points equipment availability.
-
Automated root cause analysis tools for production stoppages at the plant: +5 points production time.
-
Optimization of the process for opening satellite pits: 50% reduction in opening times